Barlings kwa Ltd are Energy Assessors based in Lincoln.

We use CLG accredited software to help demonstrate Part L compliance for both domestic and commercial buildings, the packages we use are popular throughout the industry with consultants, builders and Building Control Bodies.

At design stage of your project you will require an “As Designed” SAP/SBEM Assessment, as you near the completion of your project we will provide you with an “As Built” SAP/SBEM Report demonstrating compliance. At this stage we then produce an Energy Performance Certificate (EPC) which displays the dwelling or buildings energy efficiency rating and environmental impact rating.

In order to produce your Energy Performance Certificate (EPC) your dwelling or building will need to have an Air Pressure Test. Air Pressure Testing is carried out on site by Barlings kwa to certify that your buildings air leakage rate achieves the rate specified in the “As Designed” Assessment.

Web: www.barlingskwa.co.uk
Telephone: 01522 797344
Monday - Friday: 8.00am - 6.00pm |  Saturday: 8.00am - 4.30pm
Email: [email protected]